Jul 7, 2025
Powering Progress Across Nigeria: Serani’s Power Generation Division
At Serani Power, we understand that reliable electricity is the backbone of economic growth and industrial success. Our Power Generation Division is designed to provide robust, flexible, and efficient energy solutions across Nigeria whether through diesel and gas-fueled generators, IPP systems, or tailored rental packages. We deliver full-spectrum power services from design and assembly to installation, maintenance, and aftersales support.
Our Core Solutions
Diesel & Gas-Fueled Power Generators
Serani supplies, installs, and operates a wide portfolio of diesel and gas generators built to meet any industrial or commercial demand. Our plants are readily deployable from our national warehousing facilities and can be fully installed within weeks thanks to our seamless logistics, terrain-adaptive systems, and scalable infrastructure capabilities.
Independent Power Provider (IPP) Projects
Through strategic partnerships such as with MTU Onsite Energy, we execute large-scale IPP projects nationwide. These installations deliver uninterrupted, high-quality power to critical infrastructure, commercial hubs, and industries with round-the-clock support.
Rental Power Solutions
Need temporary or backup power? Our Rental Solutions offer tailored, location-based generator services (both diesel and gas) that include delivery, setup, maintenance, and disassembly. We operate 30+ mobile workshop units nationwide, each equipped with communication systems for rapid deployment and service coordination.
Integrated Assembly and Engineering Excellence
Serani assembles most generator components locally using support from our Steel Fabrication and Products & Solutions Divisions. Components like control panels, wiring looms, base frames, diesel tanks, and soundproof canopies are fabricated and integrated under stringent standards.
We conduct rigorous Quality Assurance checks on each unit, simulating loads from 20% to 120% to ensure field-readiness under variable conditions.
Delivery, Installation, & Commissioning
Our technical teams deliver and install power solutions nationwide, including remote and challenging terrains. Services include:
Pre-Delivery Inspection (PDI)
Site-specific installation and commissioning
User training for operators and project teams
Routine inspections and planned servicing
On-call troubleshooting and repairs
Alternator rewinding, minor & major overhauls
After-Sales Support & Spare Parts
Serani maintains fully equipped service workshops in every branch with a mobile service fleet that ensures nationwide coverage. Our after-sales services are unmatched, offering:
100% availability of preventive maintenance parts
75%–85% availability of repair and overhauling parts
72-hour turnaround for special-order parts from OEMs
Exclusive use of genuine spare parts
Advanced Power Projects – CNG & Captive Power
We deliver turnkey projects for large-scale power infrastructure, including:
Single & Combined Cycle IPPs
Captive Power Plants (CPP)
Medium/Large Bore Dual-Fuel Engines
Waste Heat Recovery Systems
Steam Turbines
Through collaborations with leading OEMs such as Wärtsilä Finland, we bring world-class technology to Nigerian soil powering industrial estates, refineries, and municipal utilities.
Why Choose Serani?
Proven track record in powerplant deployment
National coverage with rapid mobilization
In-house assembly and fabrication capacity
OEM partnerships with ABB, Schneider, MTU, and Wärtsilä
Dedicated aftersales and maintenance network
Whether you're powering a factory, construction site, or entire municipality, Serani is your reliable partner for sustainable, uninterrupted energy.